January, 1989
the land was purchased and began building the factory.
June, 1989
Moved to new factory.
January, 1990
Began producing Ductile Iron, and Maximum Productivity had reached 250 Tons per month.
June, 1990
the self-Harding Squeeze Molding Machine were newly brought in.
June, 1990
Extended 2 Tons High Frequency Furnace.
October, 1998
Purchase DISA 2070S Auto-Molding Machine, the produce line had reached to 600 Tons per month.
October, 1998
The promotion of ISO9001 Quality Guarantee System has begun.
October, 1999
Adopted ISO9001 Certification.
March, 2002
Began producing Si-Mo Iron, also researched ADI (Austempering Ductile Iron), and High-Chromium Cast
June, 2006
Technology cooperation with Japan to develop Material of High-Phosphorus Cast that used on train.
November, 2006
we removed the Self-Harding Squeeze Molding Machine. In order to protect environment. The trimming operations processes has been modifying, to push ahead achieved percentage of
scheduled.
March, 2007
purchased the flaw detector of Supersonic to control the products of quality. The monthly productivity reached to 650 Tons.
February, 2008
the Certification of TS16949 has been introduced.
March, 2008
In order to make a great quality, and promote producing line. The Automatic Mixer of Green Sand, Metallurgical Process Control of ATAS, (1.5 Tons) Austempering Heat Treatment Furnace of AFC
had purchased. Also establish a branch company.
May, 2008
On purpose make sure all of products sold out to the globe marketing are prefects, so we purchase Auto-grinding of MSB, a set of Horizontal-type Magnetic Flow Detector of KUSAKA, a set of
Microstructure Judge System of KUSAKA, and 10Kg High Frequency Furnace.
October, 2016
We obtain new version of ISO9001 certification.
December, 2016
Two additional BARINDER automatic grinding machines are newly set up.